Vandenberg SFB South Base Area District Plan (ADP) | Project 26-17

RPP Deadline Extension: 02 November 2026 9:00 AM PT

The Request for Prototype Proposals (RPP) deadline has been extended.

To view the updated RPP, please fill out the key document request form on the right side of the page.


Finalized Request for Prototype Proposals: 16 October 2026

The Request for Prototype Proposals (RPP) has been finalized and no changes were made.

To view the full RPP, please fill out the key document request form on the right side of the page.


Draft Request for Prototype Proposals: Posted 07 October 2026

To support rapidly expanding space launch missions at Vandenberg Space Force Base (VSFB) South Base, Space Launch Delta 30 (SLD 30) must overcome infrastructure limitations that constrain future operational cadence. Traditional master planning processes are not designed for the dynamic demands of high-cadence space operations. This project seeks to address these capability gaps.

To view the full dRPP, please fill out the key document request form on the right side of the page.


Coming Soon Notice: Posted 10 September 2026

In an effort to support rapidly expanding space launch missions at Vandenberg Space Force Base, Space Launch Delta 30 must overcome infrastructure limitations that constrain future operational cadence. To address these capability gaps, the Government desires an installation and utility Master Plan from the commercial sector that significantly exceeds traditional Area Development Plans (ADPs). Desired attributes of the Master Plan include optimal geospatial facility siting within launch hazard zones, exhaustive utility engineering analysis including routing and capacity upgrades for power, water, and gas on South Base. The Master Plan should also include concrete sourcing strategies and capacity upgrades to bridge gaps if current base supplies are insufficient.

The Master Plan will support Space Force installations, planners, engineers, and mission stakeholders in rapidly assessing infrastructure needs and modernization priorities required to support future launch cadence and space operations. Included in the Master Plan should be a South Base utility and mission planning model that integrates utility infrastructure, geospatial data, and operational mission requirements into a single framework. Additionally, the geospatially integrated planning approach should combine utility engineering, installation planning, and operational constraints such as explosive safety arcs, RF interference zones, launch hazards, and mission growth projections into a single decision-support model.

To view the full Coming Soon notice, please fill out the key document request form on the right side of the page.


EVENTS OVERVIEW

Innovator NETWORX

The ADP Innovator NETWORX, originally scheduled for Thursday, 15 October 2026, was canceled. Organizations interested in the ADP opportunity are encouraged to connect and explore teaming opportunities independently. The Innovator NETWORX (INX) session was designed to help participants identify potential partners and share capabilities, and that goal remains important to the success of this effort.

To view presentation slides, please fill out the key document request form on the right side of the page.


Project TALX: 08 October at 8:30 AM PT

The Government team shared details of the ADP opportunity during this virtual event.

To view resources resources from this event, please fill out the key document request form on the right side of the page.


TEAMING OPPORTUNITIES:

Interested in collaborating on the opportunity? Organizations can opt into the teaming list to share and receive contact information. This resource is designed to help you identify complementary capabilities and form effective partnerships. We encourage you to fill out the form below to be added to the teaming list. By submitting your information, you consent to sharing your details with other companies who also request access to the list.

  • Important Note: Note that the teaming list will be updated on a rolling basis, but you will not receive notifications each time a new company is added; you’ll need to revisit the link to see the most recent updates.  Teaming List Form

Interested in submitting?

All respondents must have an active NSTXL membership to submit a solution to any SpEC opportunity. To apply or check your membership status, contact our team at membership@nstxl.org. Please allow one business day for processing new applications.

NOT A MEMBER? REQUEST TO SEE DOCUMENTS!


PROJECT TIMELINE

Request for Prototype Proposals:

  • Response Deadline: 02 November 2026 at 9:00 AM PT
  • Question Deadline: 14 October 2026 at 9:00 AM PT
  • dRPP Posted: 07 October 2026 at 1:30 PM PT

Coming Soon:

  • Project TALX: 08 October 2026 at 8:30 AM PT
  • Coming Soon Posted: 10 September 2026