Phased Launch Test Demonstration (PLTD) for Strategic Systems Programs (SSP) | Project No. 25-16

OPPORTUNITY OVERVIEW:

COMING SOON NOTICE – Posted on 14 October 2025

The Department of War, in partnership with Naval Surface Warfare Center (NSWC) Crane, is preparing to release a new prototype project opportunity focused on accelerating test infrastructure readiness for strategic missile systems. This effort, Phased Launch Test Demonstration for Strategic Systems Programs, aims to enable early learning through rapid prototyping and phased testing, guiding critical decisions for missile and launcher subsystem development.

Key Areas of Interest include:

  1. Prototype Test Capability Development – Adaptable infrastructure and hardware to support air and underwater launch testing.
  2. Interface and Simulation Support – Tools and processes to ensure compatibility between performer prototypes and government test facilities.
  3. Data Collection and Analysis – High-fidelity instrumentation and data systems to support modeling, validation, and decision-making.
  4. Infrastructure Augmentation – Additional hardware and resources to avoid scheduling conflicts and support unique system requirements.

This prototype effort will inform future production decisions and long-term strategies for strategic system development and sustainment. The prototype development period of performance for Phased Launch Test Demonstration for Strategic Systems Programs Other Transaction Authority (OTA) awards will be determined following the release of the Request for Solutions (RFS) and based on selected performers’ proposed timelines.

To view the full Coming Soon notice, please fill out the Request form to See Documents on the right side of the page.


TEAMING OPPORTUNITIES:

Interested in collaborating on the opportunity? There are multiple ways to connect with potential partners. Organizations can opt into the teaming list to share and receive contact information or explore companies that presented during the virtual Innovator NETWORX teaming event. These resources are designed to help you identify complementary capabilities and form effective partnerships.

Ways to Engage:

  • Access the Innovator NETWORX Teaming Event Resources: During the virtual Innovator NETWORX teaming session held on 24 October 2025 at 1:00 PM ET, organizations had 5 minutes to present their capabilities. You can access the slide deck by filling out the Key Document Request form on the right.
  • Join the Teaming List: If you’re interested in teaming for this opportunity, we encourage you to fill out the form below to be added to the teaming list. By submitting your information, you consent to sharing your details with other companies who also request access to the list.
    • Important Note: Note that the teaming list will be updated on a rolling basis, but you will not receive notifications each time a new company is added; you’ll need to revisit the link to see the most recent updates. Phased Launch Test Demonstration (PLTD) for Strategic Systems Programs (SSP): Teaming List

Interested in submitting?

All respondents must have an active NSTXL membership to submit a solution to any S²MARTS opportunity. To apply or check your membership status, contact our team at membership@nstxl.org. Please allow one business day for processing new applications.

NOT A MEMBER?
REQUEST TO SEE DOCUMENTS!


PROJECT TIMELINE

Coming Soon Notice:

October 14, 2025 2:00 pm ET

RFS Release:

ET

Questions Due:

ET

RNI Release:

ET

Draft RFS Release:

ET

Q&A Responses:

ET

Capability Requirements Responses Due:

ET

Solution Due:

ET

Award Notice:

ET

Innovator NETWORX:

October 24, 2025 1:00 pm ET

Project TALX:

ET

1-on-1 Meetings:

ET

Responses Due:

ET

Industry Day:

ET