Family of Maintenance Trainers (FMT) Common Core (CC) Architecture and Software Baseline

  • Home
  • Family of Maintenance Trainers (FMT) Common Core (CC) Architecture and Software Baseline
To view and download the request for solutions (RFS) and supplemental documents, click the following hyperlinked text.

    Submit a Question


    In accordance with 10 U.S. Code § 2371b, an Other Transaction Agreement (OTA) has been awarded on 20 June 2019 under the Training and Readiness Accelerator (TReX) for the Family Maintenance Trainer (FMT) Common Core (CC) Diagnostic and Troubleshoot Trainer (DTT) prototype. The project was awarded to DiSTI, LLC located in Orlando, FL in the amount of $4,398,484.40 for all phases of this effort.

    The Army desires to establish a common architecture and software baseline for a suite of vehicle maintenance trainers. The goal of this effort is to analyze existing vehicle maintenance training systems and develop a prototype solution that incorporates maintenance trainers for multiple vehicle types into a common architecture to be known as the FMT-CC. The FMT-CC will provide the essential common functionality for a FMT Product Line (PL), which will enable training in critical field level maintenance tasks required for various combat/tactical vehicles. The FMT Product Line will include Diagnostic and Troubleshooting Trainers (DTTs).

    Request for Solutions:
    Family of Maintenance Trainers (FMT) Common Core (CC) Architecture and Software Baseline
    19 February 2019 (1 April 2019 Update)

    Update: Amended RFS (click to view and download): A21- RFS VTS FMT DTT OTA Amended 1 APRIL 19_Final

    Update: FMT Q&A Round 2 (click to view and download): FMT Q&A Rd 2_Final_4.01.19

    Update: FMT Q&A Round 1 (click to view and download): FMT Q&A Rd 1_Final_3.27.19

    Update: Amended RFS (click to view and download): A21- RFS VTS FMT DTT OTA 12 March 19 Amend

    Answers to Questions Submitted (click to view and download): FMT RFS Q and A 19 Feb 19 FINAL Unsorted

    This Request for Solutions (RFS) is issued to locate capable vendors with the ability to develop a prototype FMT – CC architecture and software baseline to support the existing FMT Product Line (PL) and future Virtual Training Systems (VTS). The purpose of this effort is to analyze existing systems, develop a prototype CC PL Architecture and software baseline, and validate the CC Architecture by developing prototype maintenance trainers for multiple vehicle platforms. The RFS scope is limited to the development of the prototype Diagnostic and Troubleshooting Trainer (DTT) which is part of the FMT PL. Information related to the Hands-on-Trainer (HOT) and Part Task Trainer (PTT) variants of maintenance training systems is provided for reference only. The Government will evaluate the solutions with the intent of awarding an Other Transaction Agreement (OTA) in accordance with 10 U.S. Code § 2371b.

    To view and download the initial and the twice updated RFS, click the hyperlinked text below.

    A21- RFS VTS FMT DTT OTA Amended 1 APRIL 19_Final

    A21- RFS VTS FMT DTT OTA 12 March 19 Amend

    A21- RFS VTS FMT DTT OTA Amended 27 Feb 2019

    A21- RFS VTS FMT DTT OTA 19 Feb 19 FINAL

    Additional information to be provided includes the documents listed below (click the hyperlinked text to view or download):

    FMT Q&A Rd 2_Final_4.01.19

    FMT Q&A Rd 1_Final_3.27.19

    LT2_Operations_Guide

    OPSEC Requirements 20 DEC 2018

    DTT_WBS_4_FEB_2019

    DTT_WBS_Dictionary_4_FEB_2019

    Additional information to be provided includes the documents listed below. As indicated in the RFS, please request the below listed information by downloading, filling out, and signing the distribution agreement below (click the hyperlinked text) and submit a request to [email protected].

    VTS FMT_GFI_DTT_Tech_Data_Distribution_Agreement 6_Mar_19

    OTA TReX DTT GFI List 06 Mar 19